Print Outline

Section 01: Introduction to Turnarounds/Shutdowns

• Understanding Terminology and Process
• Schedule in Big Scheme
• Scheduling Values
• Understanding Primavera Structure

Section 02: Setting Up User Preferences

• Logging into Primavera
• User Preference Guide

Section 03: Basic Primavera Navigation

• Toolbars & Menus
• Understanding & Saving Layouts

Section 04: Creating a Project

• Utilizing the Project Wizard
• Understanding Project Details & Settings

Section 05: Work Breakdown Structure (WBS)

• Identifying Standard Turnaround WBS
• Creating a WBS
• Utilizing the WBS

Section 06: Calendars

• Understanding the calendar functionality
• Understanding Time Periods
• Creating new calendars

Section 07: Adding & Configuring Activities

• Using the Activity Wizard
• Identifying Activity Types
• Adding Activities
• Creating Job Templates
• Activity Relationships
• Understanding Lag & Constraints

Section 08: Scheduling Concepts

• Critical Path Method Scheduling
• Understanding Float & Critical Path
• Schedule Log Utilization

Section 09: Activity Codes

• Building Code with Structure
• Creating Activity Codes at Different Levels
• Methods for Assigning Codes

Section 10: Customizing the Project

• Understanding Group and Sort
• Understanding and Utilizing Filters
• Importing & Exporting Layouts
• Bars, Fonts, and Row Heights

Section 11: Creating & Assigning Resources

• Understanding Resources
• Creating Resource Pools
• Assigning Resources to Activities
• Viewing Resource Profiles

Section 12: Schedule Optimization

• Analyzing Schedule Dates
• Analyzing Critical Activities
• Analyzing Resource Allocations

Section 13: Maintaining & Assigning Baselines

• Understand Baselines
• Creating Baselines
• Utilizing Baselines

Section 14: Scheduling During Execution

• Creating Look-Aheads
• Updating Activities