Section 01: Introduction to Turnarounds/Shutdowns
• Understanding Terminology and Process
• Schedule in Big Scheme
• Scheduling Values
• Understanding Primavera Structure
Section 02: Setting Up User Preferences
• Logging into Primavera
• User Preference Guide
Section 03: Basic Primavera Navigation
• Toolbars & Menus
• Understanding & Saving Layouts
Section 04: Creating a Project
• Utilizing the Project Wizard
• Understanding Project Details & Settings
Section 05: Work Breakdown Structure (WBS)
• Identifying Standard Turnaround WBS
• Creating a WBS
• Utilizing the WBS
Section 06: Calendars
• Understanding the calendar functionality
• Understanding Time Periods
• Creating new calendars
Section 07: Adding & Configuring Activities
• Using the Activity Wizard
• Identifying Activity Types
• Adding Activities
• Creating Job Templates
• Activity Relationships
• Understanding Lag & Constraints
Section 08: Scheduling Concepts
• Critical Path Method Scheduling
• Understanding Float & Critical Path
• Schedule Log Utilization
Section 09: Activity Codes
• Building Code with Structure
• Creating Activity Codes at Different Levels
• Methods for Assigning Codes
Section 10: Customizing the Project
• Understanding Group and Sort
• Understanding and Utilizing Filters
• Importing & Exporting Layouts
• Bars, Fonts, and Row Heights
Section 11: Creating & Assigning Resources
• Understanding Resources
• Creating Resource Pools
• Assigning Resources to Activities
• Viewing Resource Profiles
Section 12: Schedule Optimization
• Analyzing Schedule Dates
• Analyzing Critical Activities
• Analyzing Resource Allocations
Section 13: Maintaining & Assigning Baselines
• Understand Baselines
• Creating Baselines
• Utilizing Baselines
Section 14: Scheduling During Execution
• Creating Look-Aheads
• Updating Activities