2012P/2012PN – Primavera P6 FEED & Detail Design

Print Outline

Section 01: Capital Integration Overview

• Overview of the client integration of schedules

Section 02: FEED & Detail Design

• Overview of the FEED & Detail Designs schedules and utilizing the template process

Section 03: Creating the Enterprise Project Structure

• Understanding the EPS
• Basic EPS build

Section 04: User Preferences

• How user preferences affect the project
• Setting user preferences

Section 05: Creating a Project

• Utilizing the Project Wizard
• Creating new calendars

Section 06: Calendars

• Understanding the Calendar Funtionality
• Creating New Calendars

Section 07: Work Breakdwon Structure (WBS)

• Identifying Standard Engineering WBS
• Creating a WBS
• Utilizing the WBS

Section 08: Activities & Relationships

• Activity & Relationship Types
• Duration & Percent Complete Types
• Adding Activities
• Creating Activity Relationships
• Understanding Lag

Section 09: Activity Codes

• Building Code with Structure
• Creating Activity Codes at Different Levels
• Methods for Assigning Codes

Section 10: Budget Developement

• Creating Resources
• Managing Resources
• Reporting Resource Loaded Activities

Section 11: Customizing the Project

• Understanding Group and Sort
• Understanding & Utilizing Filters
• Importing & Exporting Layouts
• Bars, Fonts, and Row Heights

Section 12: Managing & Assigning Baselines

• Understanding Baselines
• Creating Baselines
• Utilizing Baselines

Section 13: Scheduling the Project

• Understanding Float & Critical Path
• Free Float & Total Float
• Progressing Activities
• Schedule Log Files

Section 14: Reporting

• Report Window
• Running Reports
• Batch Reports

2013P/2013PN – Primavera P6 Construction & Commissioning

Print Outline

Section 01: Capital Integration Overview

• Overview of client integration of schedules and where the construction and commissioning file fits in

Section 02: Construction / Commissioning

• Overview of construction and commissioning schedule process and requirements

Section 03: Creating the Enterprise Project Structure

• Understanding the EPS
• Basic EPS build

Section 04: User Preferences

• How user preferences affect the project
• Setting user preferences

Section 05: Creating a Project

• Utilizing the Project Wizard
• Creating new calendars

Section 06: Calendars

• Understanding the Calendar Functionality
• Creating New Calendars

Section 07: Work Breakdown Structure (WBS)

• Identifying Standard CAP Project WBS
• Creating a WBS
• Utilizing the WBS

Section 08: Activities & Relationships

• Activity & Relationship Types
• Duration & Percent Complete Types
• Adding Activities
• Creating Activity Relationships
• Understanding Lag

Section 09: Activity Codes

• Building Code with Structure
• Creating Activity Codes at Different Levels
• Methods for Assigning Codes

Section 10: Budget Development

• Creating Resources
• Managing Resources
• Reporting Resource Loaded Activities

Section 11: Customizing the Project

• Understanding Group and Sort
• Understanding & Utilizing Filters
• Importing & Exporting Layouts
• Bars, Fonts, and Row Heights

Section 12: Managing & Assigning Baselines

• Understanding Baselines
• Creating Baselines
• Utilizing Baselines

Section 13: Scheduling the Project

• Understanding Float & Critical Path
• Free Float & Total Float
• Progressing Activities
• Schedule Log Files

Section 14: Reporting

• Report Window
• Running Reports

2016T/2016TN – Basic Turnaround Scheduling – P6

Print Outline

Section 01: Introduction to Turnarounds/Shutdowns

• Understanding Terminology and Process
• Schedule in Big Scheme
• Scheduling Values
• Understanding Primavera Structure

Section 02: Setting Up User Preferences

• Logging into Primavera
• User Preference Guide

Section 03: Basic Primavera Navigation

• Toolbars & Menus
• Understanding & Saving Layouts

Section 04: Creating a Project

• Utilizing the Project Wizard
• Understanding Project Details & Settings

Section 05: Work Breakdown Structure (WBS)

• Identifying Standard Turnaround WBS
• Creating a WBS
• Utilizing the WBS

Section 06: Calendars

• Understanding the calendar functionality
• Understanding Time Periods
• Creating new calendars

Section 07: Adding & Configuring Activities

• Using the Activity Wizard
• Identifying Activity Types
• Adding Activities
• Creating Job Templates
• Activity Relationships
• Understanding Lag & Constraints

Section 08: Scheduling Concepts

• Critical Path Method Scheduling
• Understanding Float & Critical Path
• Schedule Log Utilization

Section 09: Activity Codes

• Building Code with Structure
• Creating Activity Codes at Different Levels
• Methods for Assigning Codes

Section 10: Customizing the Project

• Understanding Group and Sort
• Understanding and Utilizing Filters
• Importing & Exporting Layouts
• Bars, Fonts, and Row Heights

Section 11: Creating & Assigning Resources

• Understanding Resources
• Creating Resource Pools
• Assigning Resources to Activities
• Viewing Resource Profiles

Section 12: Schedule Optimization

• Analyzing Schedule Dates
• Analyzing Critical Activities
• Analyzing Resource Allocations

Section 13: Maintaining & Assigning Baselines

• Understand Baselines
• Creating Baselines
• Utilizing Baselines

Section 14: Scheduling During Execution

• Creating Look-Aheads
• Updating Activities

3316T/3316TN – Turnaround Cost – Basic

Print Outline

Section 01: Introduction

• Skills Required for Cost
• Cost Accountant Vs Cost Engineer
• Capital Vs Turnaround

Section 02: Terminology

• Review standard cost terminology

Section 03: Cost Management Process

• Discuss Resource Planning, Cost Estimating, Cost Budgeting, and Cost Control.
• Why it is important

Section 04: Turnaround Cost Cycle – High Level

• Discuss each phase of the Turnaround Lifecycle
• Discuss each phase of the Turnaround Cost Lifecycle

Section 05: Cost Breakdown Structure

• Discuss the 4 high-level cost groups and how each are defined.
• Discuss the importance of breaking each group out further and how it aligns with the schedule

Section 06: Estimate Development

• Discuss the different Estimates (Preparation, +/-50%, +/30%, +/-10%)
• Considerations for Development

Section 07: Budget Development

• Estimate vs Budget
• Discuss Histogram
• Review Staffing Plan, Bid Sheet, & Estimate breakdown sheet.
• Discuss Purchase Orders & Control Budget

Section 08: Industry Changes in Cost Control

• Work Orders vs Purchase Orders
• Challenging vs Accepting estimates or bids

Section 09: Preparing for Execution

• Communication with timekeepers
• Onboarding meetings
• Building required spreadsheets

Section 10: Cost Tracking & Control

• High level review of Cost Report
• Discuss Daily Force Reporting
• Discuss Daily Timesheet Reporting

Section 11: Deliverables to Management

• Briefly discuss typical deliverables

Section 12: Closeout

• Briefly discuss the closeout process and activities

3326T/3326TN – Turnaround Cost – Advanced

Print Outline

Section 01: Review

• Briefly review items covered in the basic class

Section 02: Cost Reports

• Discuss what each header on the Cost Report represents and how it is determined or calculated
• Discuss other data that is tracked on the Cost Report

Section 03: Baseline Budget Curve

• Discuss the purpose of baselining
• Building a Curve

Section 04: Change Management

• Discuss the purpose of Change Management
• Discuss how cost changes are determined and how they are communicated to the Cost Group
• Update Cost Report to reflect Change Work Requests

Section 05: Forecasting

• Discuss type of Contracts
• Discuss methods for forecasting
• Update Forecast Curve
• Create Monthly forecast file for Accounting

Section 06: Deliverables to Management

• Discuss typical deliverables
• Create a Management Report

Section 07: Accruals

• Discuss the purpose of Accruals
• Create Accruals file for Accounting

Section 08: Allocating to Projects

• Discuss situations in which allocation to projects is necessary or required
• Create Allocation Percentages
• Create a monthly allocation file for Accounting

Section 09: Closeout

• Discuss responsibilities during closeout
• Discuss considerations during invoice reconciliation.
• Reconcile an Invoice
• Create PO Closeout Report

1041T – Management Expectations from Primavera for Turnarounds

Print Outline

  • Developing a Good Schedule
  • Schedule Lifecycle – Management Expectations
  • Primavera Reports
    • Manpower
    • Critical Path / Critical Mass
    • Earned vs. Planned compared to Actual o Schedule Updates
    • Change Management
  • Key Trigger Points to Ensure Good Schedule Development
  • Integrated Reporting
  • Reading Reports

This course allows managers and project team members to execute work utilizing the Primavera software.

1041P – Management Expectations from Primavera for Capital Projects

Print Outline

  • Developing a Good Schedule
  • Schedule Lifecycle – Management Expectations
  • Primavera Reports
    • Manpower
    • Critical Path / Critical Mass
    • Earned vs. Planned compared to Actual o Schedule Updates
    • Change Management
  • Key Trigger Points to Ensure Good Schedule Development
  • Integrated Reporting
  • Reading Reports

This course allows managers and project team members to execute work utilizing the Primavera software.

1022N – Primavera P6 Professional Advanced Course

Print Outline

Course Topics

Session 01: User and Admin Preferences

  • Review and adjust specific user and admin preferences to provide an in-depth understanding of how they can affect scheduling

Session 02: Duration and Percent Complete Types

  • Hands on review of how activity Duration Type affects schedule calculations
  • Hands on review of how activity Percent Complete Type affects schedule calculations, specifically around earned value reporting
  • Review common default project settings

Session 03: Utilizing P6 Cost Accounts

  • Cost Accounts Relationship to Earned Value Reporting
  • Example Utilizing All Earned Value Components
  • Cost Account Structure in P6
  • Create a Cost Account Structure
  • Assigning Cost Accounts to activity Resource Assignments or Expense Assignments

Session 04: Importing and Exporting

  • P6 XER file import and Export
  • Excel Import and Export
  • Exporting and Importing Layouts and Reports

Session 05: Utilizing Cost

  • Understand how the Resource Type affects units, cost, and earned value field calculations
  • Apply hourly rates to labor, non-labor, and material resources
  • Add expense items with cost
  • View the overall costs for a P6 project file

Session 06: Allocating Resources

  • Setting Up the Resource Assignments View Layout
  • Apply Budgets and Assign Cost Accounts in the Assignments View
  • Changing Resources on Assignments

Session 07: Resource Leveling

  • Leveling Concepts
  • P6 Leveling Settings
  • Activity Leveling Priorities
  • Creating Shift Calendars
  • Setting the Resource Limits (Max Units/Time)
  • Adjust Resource Limits (Max Units/Time)
  • View and Print a Resource Profile Summary

Session 08: Advanced Scheduling Concepts

  • Adding Contingency to a Schedule
  • Retained Logic and Progress Override
  • Calendar Effect on Relationship Lag Assignments
  • Calculating Multiple Float Paths

Session 09: User Defined Fields and Global Change

  • Define and Create User Defined Fields
  • Understanding the Global Change Functionality
  • Create and Apply a Global Changes

Session 10: Change Control and Baseline Updates

  • Use a P6 Staging Project for Pending Changes
  • Performing “What-If” Schedule Analysis
  • Apply Approved Changes to a Project
  • Baseline Updates with Schedule Changes

Session 11: Reflection Projects

  • Understand Reflection Projects
  • The Common uses for Reflection Projects
  • Create, Edit, and Merge a Reflection Project

1022 – Primavera P6 Professional Advanced Course

Print Outline

Course Topics

Session 01: User and Admin Preferences

  • Review and adjust specific user and admin preferences to provide an in-depth understanding of how they can affect scheduling

Session 02: Duration and Percent Complete Types

  • Hands on review of how activity Duration Type affects schedule calculations
  • Hands on review of how activity Percent Complete Type affects schedule calculations, specifically around earned value reporting
  • Review common default project settings

Session 03: Utilizing P6 Cost Accounts

  • Cost Accounts Relationship to Earned Value Reporting
  • Example Utilizing All Earned Value Components
  • Cost Account Structure in P6
  • Create a Cost Account Structure
  • Assigning Cost Accounts to activity Resource Assignments or Expense Assignments

Session 04: Importing and Exporting

  • P6 XER file import and Export
  • Excel Import and Export
  • Exporting and Importing Layouts and Reports

Session 05: Utilizing Cost

  • Understand how the Resource Type affects units, cost, and earned value field calculations
  • Apply hourly rates to labor, non-labor, and material resources
  • Add expense items with cost
  • View the overall costs for a P6 project file

Session 06: Allocating Resources

  • Setting Up the Resource Assignments View Layout
  • Apply Budgets and Assign Cost Accounts in the Assignments View
  • Changing Resources on Assignments

Session 07: Resource Leveling

  • Leveling Concepts
  • P6 Leveling Settings
  • Activity Leveling Priorities
  • Creating Shift Calendars
  • Setting the Resource Limits (Max Units/Time)
  • Adjust Resource Limits (Max Units/Time)
  • View and Print a Resource Profile Summary

Session 08: Advanced Scheduling Concepts

  • Adding Contingency to a Schedule
  • Retained Logic and Progress Override
  • Calendar Effect on Relationship Lag Assignments
  • Calculating Multiple Float Paths

Session 09: User Defined Fields and Global Change

  • Define and Create User Defined Fields
  • Understanding the Global Change Functionality
  • Create and Apply a Global Changes

Session 10: Change Control and Baseline Updates

  • Use a P6 Staging Project for Pending Changes
  • Performing “What-If” Schedule Analysis
  • Apply Approved Changes to a Project
  • Baseline Updates with Schedule Changes

Session 11: Reflection Projects

  • Understand Reflection Projects
  • The Common uses for Reflection Projects
  • Create, Edit, and Merge a Reflection Project

 

1013TN – Primavera P6 Professional Basic Course for Turnarounds

Print Outline

Course Topics

Session 01: Introduction

  • The Turnaround Terminology and Process
  • Where the schedule fits in the big scheme
  • Values of Schedule
  • The Primavera Technical Structure
  • The Hierarchical Structure of P6 Data Session 02: User and Admin Preferences
  • Understand how user preferences work
  • Set up and establish user preferences for a turnaround scheduling
  • Review and modify specific admin preferences

Session 03: Basic Navigation

  • The P6 toolbars and menus
  • The structure of typical P6 layouts (views)
  • How to edit toolbars
  • Saving and opening layouts
  • P6 hot keys

Session 04: Creating the EPS

  • How the EPS is utilized in the Primavera software
  • How to create the EPS and the thought process behind it

Session 05: Creating a P6 Project

  • Use the wizard to create a project, identifying the initial attributes
  • Discuss and modify certain project settings and make critical adjustments before beginning project development
  • Define the default settings for new activities
  • Review the different activity duration types and how each calculate
  • Review the activity percent complete types and how they affect earned value reporting
  • Define other project settings typical for turnaround scheduling

Session 06: The P6 Work Breakdown Structure

  • Identify a standard Turnaround Work Breakdown Structure (WBS)
  • Fully utilize all (WBS) capabilities in the details view to make the schedule more user friendly for reporting, updating, and managing turnaround equipment plans/job plans
  • Understand the concept of utilizing the WBS for moving data from historic or template projects into a new turnaround project file
  • Build a WBS

Session 07: Creating Calendars

  • Identify the three different types of calendars
  • View and Edit Calendars

Session 08: Adding and Configuring Activities

  • Add an activity using the New Activity Wizard
  • Review the different activity types
  • Utilize a template to add Job Plans
  • Perform a simple Global Change
  • Use the Replace and Re-number Activities Functionality
  • Use an Excel Template to Import Activity Data
  • Understand the Different Relationship Types
  • Add Activity Relationships utilizing different techniques
  • Understand and apply Relationship Lag
  • Understand Constraint Types and apply Constraints

Session 09: Scheduling

  • Understand Critical Path Method (CPM Scheduling)
  • Understand the Data Date
  • Understand Total Float and Free Float
  • Resolve Circular Relationships
  • Identify Open Ends
  • Review the Schedule Log

Session 10: Activity Codes

  • Understand the difference between Global, EPS, and Project activity codes
  • Understand unique Coding ID’s for Primavera at an Enterprise level
  • Build activity codes structures with smart code values
  • Create a Code Assignment Layout
  • Assign activity codes utilizing multiple techniques

Session 11: Customizing Layouts

  • Group and Sort activities
  • Understand how to build and save a layout
  • Utilize filters in layouts
  • Edit appearances of fonts, row heights, and bars
  • Import and Export Layouts

Session 12: Creating and Assigning Resources

  • Understand the fully resource loaded schedule
  • Understand P6 resources and attributes
  • Create a turnaround specific resource pool
  • Understand different techniques for assigning resources to activities
  • Review Resource Profiles

Session 13: Optimizing the Project Plan

  • Analyze schedule dates
  • Analyze Critical Activities
  • Shorten a project schedule
  • Analyze resource allocation

Session 14: Baselining the Project Plan

  • Understand what a baseline is
  • Understand the purpose for two baselines in turnaround scheduling
  • Create a baseline and maintain that baseline against the existing project
  • Edit and show the baseline bars in the Gantt chart
  • Conduct baseline variance reporting
  • Restore a Baseline
  • Convert a Restored Baseline Back to the Baseline of the Current Schedule

Session 15: Project Execution and Control

  • Understand the Update Process and Required Reports
  • Build a status entry layout
  • Perform activity updates utilizing multiple techniques
  • Advance the Data Date
  • Resolve actual start and finish dates ahead of the data date
  • Understand Retained Logic and Progress Override Schedule Options

Session 16: P6 Reporting

  • Understand the Reports Window
  • Create a Report
  • Run existing reports and review the output options
  • Preview additional functionality in the P6 Report Editor